Common mistakes
- Common mistakes
Subtracting an outlay from an already net NPV
Check whether a supplied amount is gross present value or already net of the investment.
- Common mistakes
Interchanging ROIC capital bases
Reconcile the chosen operating denominator before substituting a funding total.
- Common mistakes
Clamping an invalid pricing weight to zero or one
Resolve the model input inconsistency rather than altering the derived weight.
- Common mistakes
Reporting a weighted expiry amount as current value
Apply the period discount after forming the pricing-weighted payoff.
- Common mistakes
Assuming equal weights in every binomial model
Derive the state weight rather than treating two branches as equally priced.
- Common mistakes
Using an annual rate for a shorter binomial period
Convert the quotation to the exact model interval before pricing.
- Common mistakes
Inverting the two-state hedge ratio
Use claim difference per underlying-price difference for replicating units.
- Common mistakes
BA II PLUS: treating a cash-flow frequency as payments per year
Separate repeated entry counts from the calendar interval of the schedule.
- Common mistakes
BA II PLUS: dividing the nominal rate twice
Check the frequency state before entering a manually divided annual quotation.
- Common mistakes
Treating average question time as an official cutoff
Inspect the source and units before enforcing a derived pace.
- Common mistakes
Treating an implied forward as a certain future rate
Separate a present curve relationship from a realized future rate.
- Common mistakes
Averaging spot rates before discounting
Diagnose a rate average that changes the payment-date valuation.
- Common mistakes
Using a par coupon as every spot rate
Diagnose a single par-coupon percentage applied to all maturities.
- Common mistakes
Adding forward rates instead of compounding
Identify a percentage sum that omits cross-period accumulation.
- Common mistakes
Assuming independence in every multiple-test screen
Inspect the product step rather than treating 1 − (1 − alpha)^m as universal.
- Common mistakes
Halving every two-sided p-value
Check the statistic sign and the planned alternative before using a tail shortcut.
- Common mistakes
Treating a p-value as the probability of the null
Repair the reversal from a model-conditional tail area to a hypothesis probability.
- Common mistakes
Treating a webpage date as a factor version
Open the actual factor dataset before naming its release or data year.
- Common mistakes
Netting an action-impact estimate from an inventory
Inspect the measurement boundary before subtracting unlike quantities.
- Common mistakes
Treating a consultation proposal as a current standard
Distinguish a published method from a proposal and an announced future development plan.
- Common mistakes
Basis points, percentage points and decimal yield changes
Avoid a hundredfold error when entering yield changes in formulas.
- Common mistakes
Why a cash-cycle reduction does not specify cash released
Use each changed component’s own flow base instead of multiplying all days by COGS.
- Common mistakes
Mixing average and ending assets in DuPont analysis
Check that the asset amount cancels between turnover and the equity multiplier.
- Common mistakes
Why dividing an effective annual rate by twelve changes the model
Use the annual growth factor to obtain an equivalent monthly rate.
- Common mistakes
Material nonpublic information during an engagement meeting
Identify the information-handling issue before making a trading recommendation.
- Common mistakes
A rising goodwill percentage does not identify its cause
Separate changes in the numerator from changes in the asset denominator.
- Common mistakes
Recognising a solution versus solving independently
Check what you can produce before viewing the worked answer.
- Common mistakes
Why P(A given B) differs from P(B given A)
Recover the joint probability, then divide by the probability of the new condition.
- Common mistakes
Variance in percentage units and decimal-return units
Account for the squared scale factor when converting variance.
- Common mistakes
Using a return-tail sign in a loss quantile
Convert the modeled quantity before choosing the percentile direction.
- Common mistakes
Putting variance into a normal tail formula
Use standard deviation for the location-scale multiplier.
- Common mistakes
Square-root scaling the whole normal VaR
Scale the mean and dispersion separately in an additive independent-period model.
- Common mistakes
Treating a normal density plot as a loss bound
Keep display endpoints separate from model support.
- Common mistakes
Allowing negative holder payoff in a vanilla option
Apply the contract floor before adding the premium or writer sign.
- Common mistakes
Reading a finite payoff chart as a risk cap
Separate the displayed scenario range from the payoff function’s domain.
- Common mistakes
Dropping premium from an option profit
Inspect whether the calculation reported contract payoff as position profit.
- Common mistakes
Using call subtraction for a put payoff
Recover the strike-minus-price difference in the below-strike region.
- Common mistakes
Subtracting a writer’s received premium
Use the actual cash-flow direction for the selected side.
- Common mistakes
Taking absolute values of signed risk contributions
Keep the hedge effect in an additive Euler decomposition.
- Common mistakes
Omitting the second covariance cross term
Recover the factor two from the variance expansion.