CAIA resources
Alternative investments and portfolio applications
- Formulas
IRR equation and the rate domain
Keep timing, zero flows and admissible discount factors in the root equation.
- Worked examples
Two IRR roots and an NPV profile
Evaluate one fixed cash-flow schedule at several stated rates.
- Calculator guides

BA II PLUS: N, years and payment periods
Convert the horizon into the intervals represented by the TVM worksheet.
- Calculator guides

BA II PLUS: NPV rate per cash-flow interval
Use the discount rate for one Cash Flow worksheet interval.
- Templates

Cash-flow period entry sheet
Download a schedule that retains time zero, interval units and zero-flow periods.
- Practice
Practice: calculator state and timing
Diagnose three different input-state mistakes with explained alternatives.
- Revision
Financial calculator preflight checklist
Check state, units, signs and the schedule before interpreting a computed result.
- Calculator guides

BA II PLUS: cash-flow signs and perspective
Identify whose inflows and outflows the entries describe.
- Templates

Calculator input-state log
Download an editable record of worksheet settings and expected mathematical results.
- Calculator guides

BA II PLUS: an unused PMT in a single-sum exercise
Diagnose the modeled extra payments before attributing an unexpected answer to rounding.
- Comparisons
BA II PLUS: TVM and Cash Flow worksheets
Choose the worksheet from the cash-flow pattern and its timing convention.
- Calculator guides

BA II PLUS: preserve zero cash-flow intervals
Retain elapsed periods even when their cash-flow amount is zero.
- Common mistakes
Treating average question time as an official cutoff
Inspect the source and units before enforcing a derived pace.
- Exam guides
CAIA curriculum edition and exam-cycle matching
Choose the relevant official material before building a preparation plan.
- Exam guides
CAIA Level I exam format for upcoming candidates
Use the currently linked 2027 handbook rather than an obsolete format summary.
- Study plans
CAIA Level II written and selected-response rehearsal
Keep the current tested reading scope beside original application practice.
- Exam guides
CAIA Level II constructed-response format
Prepare concise applied answers using the currently linked 2027 structure.
- Templates

Constructed-response command and evidence log
Draft a response around the action requested and the relevant case facts.
- Templates

Exam-source and edition checklist
Keep the intended cycle, tested year and material identity together.
- Tool guides
Practice pacing: reserve and average
Read an allocation as a selected plan rather than a question-level rule.
- Tools

Practice-question time-budget calculator
Choose a block duration and review reserve, then inspect the answering allocation.
- Practice
Practice-budget and question-unit checks
Test selected allocations without claiming they are official timing rules.
- Templates

Practice-block review record
Retain your chosen time allocation and the reasons behind slow or incorrect answers.
- Practice
Candidate-source and response interpretation
Check edition labels, tested-year rules and prompt completeness.
- Worked examples
Answer a two-part finance prompt
Separate a numerical result from a statement about what it represents.
- Lessons
Constructed response: action, evidence and answer
Build a concise response that addresses the task actually requested.
- Revision
Candidate-preparation record checklist
Review the programme, cycle, source, format and chosen rehearsal before study decisions.
- Comparisons
Official exam duration and chosen practice allocation
Distinguish the authority’s content time from a reserve selected for rehearsal.
- Careers
Building a financial analyst work sample
Create an original research note that shows inputs, assumptions and reasoning.
- Careers
Showing evidence and assumptions in a finance work sample
Separate observed facts, model assumptions and conclusions in a project note.
- Comparisons
Simple and effective annualized trade-credit costs
Compare distinct rate conventions before comparing financing alternatives.
- Comparisons
Discrete and continuous compounding conventions
Compare mathematical growth factors without treating a benchmark as an investment product.
- Comparisons
Interest coverage and cash payment capacity
Distinguish an earnings-based quotient from the timing of cash available for a payment.
- Comparisons
Current, quick and cash ratios: comparing the numerators
Identify which current assets enter each stated measure.
- Comparisons
Operating cycle and cash conversion cycle
Distinguish the operating clocks from the net clock after supplier-payment timing.
- Comparisons
Net working capital and current ratio
Separate an amount difference from a relative balance-sheet measure.
- Concepts
A level perpetuity and its convergence condition
Use the infinite-stream formula only with the required timing and positive discount rate.
- Concepts
MOIC: investment value relative to contributed capital
Understand a value multiple and why it does not describe timing.
- Concepts
Discounting with a negative periodic rate
Explain why a future fixed payment can have a present value above its amount.
- Concepts
Retained earnings and cash are different balances
Distinguish an accumulated equity component from a liquid asset.